New planned wind development signal — 3 units / 21 MW
Marsberg, Nordrhein-Westfalen · Operator: Operator ID ABR928291291924 (name not resolved)
3 planned units · 21 MW · First observed 18 Sept 2026
- MaStR evidence: HIGH
- Registry only · external search performed; no project corroboration
What changed
3 new planned wind units totalling 21 MW were first observed in this MaStR snapshot.
Why this ranks high. Mid-sized 21 MW signal, 3 registrations moving together and freshly registered planned asset. Operator identity is unresolved, which reduces immediate actionability; a targeted external search found no reliable corroborating source yet, which is not proof that the project does not exist.
What we found
External verification: Searched, no reliable evidence found
A targeted search (5 queries) found no sufficiently reliable external source for this wind development in Marsberg. This does not show that the project does not exist. No public procurement evidence was found in this verification run.
- Project company
- Not resolved
- Developer
- Not identified
- Project evidence
- None
- Commercial evidence
- None found
We searched and found no reliable external evidence yet. This is not proof that the project does not exist.
- Öffentliche Bekanntmachung gemäß § 5 Abs. 2 des ...“… chael Flocke auf Erteilung einer Genehmigung gem. § 16 b BImSchG im Stadtgebiet Marsberg Die Windpark Himmelreich GmbH & Co. KG, v.d. E & L Energie & Landwirtschaft Verwaltungs-GmbH, v.d. GF Michael Flocke mit Sitz in 34431 Marsberg-Meerhof, Zur Egge 17 hat beim Hochsauerlandkreis, als zuständiger Genehmigungsbehörde, am 17.03.2025 die Er …”
- Öffentliche Bekanntmachung“… r Gemeinde Leopoldshöhe Der Windpark Greste GmbH & Co. KG, Zur Egge 17 in 34431 Marsberg, wurde mit Bescheid vom 30.06.2025 die Änderungsgenehmigung (Repowering) gem. § 16b Abs. 1 Bundes-Immissionsschutzgesetz (BImSchG) für die Errichtung und den Betrieb von einer Windenergieanlage des Typs Enercon E-138 EP3 E3 (Nennleistung: 4.260 kWel, …”
- [PDF] Abwägung § 3 (2), § 4 (2) BauGB - Stadt Marsberg“Stadt Marsberg – 80. Änderung des Flächennutzungsplanes für den Windpark-Giershagen Beteiligung der Öffentlichkeit und der Behörden und sonstigen Träger öffentlicher Belange gemäß §§ 3 (1) und 4 (1) BauGB sowie der Nachbargemeinden gem. § 2 (2) BauGB Seite 3 von 35 Stand: 24.06.2025 lfd. Nr. Einwender/in; Datum der Einwendung lfd. Nr. Äuß …”
No public procurement evidence was found in this verification run.
No independent external sources.
Registry lead relevance: 61 (unchanged by external verification)
Why it may matter
Possible relevance
Investigation hypotheses only. They are not evidence that any of these needs currently exist.
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
Verify next
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
Change summary
- Planned units first observed
- 3
- Total registered capacity
- 21 MW
- Capacity per unit
- 7 MW each
- First observed in MaStR snapshot
- 18 Sept 2026
- Planned commissioning
- 17 Sept 2029
Underlying registrations
GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.
Underlying registrations (3)
SEE944045826150View official MaStR record ↗SEE915835652594View official MaStR record ↗SEE962323158182View official MaStR record ↗
Grouping basis
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
MaStR technical details
- Asset type (MaStR)
- Horizontalläufer
- Energy carrier (MaStR)
- Wind
- Operating status (MaStR)
- In Planung
Evidence confidence
MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: searched, no reliable evidence found; a targeted search found no sufficiently reliable external source, which is not proof that the project does not exist. External evidence is additional context and never replaces or downgrades the MaStR record; project corroboration is not evidence of procurement or buyer intent.
Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.
Snapshot transition
First tracked snapshot → 18 Sept 2026