Commissioned asset
41Lead relevance · Low

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance41

  • Project scale (MW)13
  • Event type6
  • Lifecycle stage3
  • Recency6
  • Operator identified10
  • Multi-unit evidence3

Signal materiality26

  • Event type12
  • MW affected9
  • Units affected5

2 wind units commissioned — 2 units / 13.6 MW

Weißenbrunn, Bayern · Operator: Bürgerwindpark Weißenbrunn-Gössersdorf GmbH & Co. KG

2 units · 13.6 MW

Asset typeHorizontalläufer
Energy carrierWind
Registered operatorBürgerwindpark Weißenbrunn-Gössersdorf GmbH & Co. KG

2 wind units (13.6 MW) moved from planned to commissioned status in MaStR, with registered commissioning dates between 21 Sept – 28 Sept 2026.

Why this ranks here. Mid-sized 13.6 MW signal and the registered operator is known. Already commissioned, so it is weighted below early-stage signals; no external evidence yet.

Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.
O&MAsset transactionsMarket intelligence

Investigation hypotheses only. They are not evidence that any of these needs currently exist.

Units commissioned
2
Total registered capacity
13.6 MW
Commissioned between
21 Sept – 28 Sept 2026
Lifecycle change
Planned → commissioned

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“wea bürgerwindpark weißenbrunn gössersdorf…”); Identical registered capacity; Planned/commissioning dates within 7 days of each other
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Asset type (MaStR)
Horizontalläufer
Energy carrier (MaStR)
Wind
Operating status (MaStR)
In Betrieb

MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: not checked; no sources outside MaStR have been consulted.

Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.

6 Oct 2026 → 15 Oct 2026

← Back to the brief · 2026-10-18