New planned asset
63Lead relevance · High

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance63

  • Project scale (MW)19
  • Event type20
  • Lifecycle stage10
  • Recency1
  • Operator identified4
  • Multi-unit evidence7
  • External verification2

Signal materiality46

  • Event type20
  • MW affected14
  • Units affected12

New planned wind development signal — 6 units / 42 MW

Schillsdorf, Schleswig-Holstein · Operator: Operator ID ABR996008949369 (name not resolved)

6 planned units · 42 MW · First observed 25 Sept 2026

Asset typeHorizontalläufer
Energy carrierWind
Registered operatorOperator ID ABR996008949369 (name not resolved)

6 new planned wind units totalling 42 MW were first observed in this MaStR snapshot.

Why this ranks high. Mid-sized 42 MW signal and 6 registrations moving together. Operator identity is unresolved, which reduces immediate actionability; external corroboration is only partial.

External verification: Partially corroborated

Some external sources mention a wind development in Schillsdorf, but the match to the registered project is incomplete. Public project evidence found as early as 12 Jan 2025; GridGraph first observed the MaStR registration on 25 Sept 2026. No public procurement evidence was found in this verification run.

Project company
Not resolved
Developer
Not identified
Project evidence
Partial
Commercial evidence
None found
  • Windpark WP Altbokhorst Schillsdorf. Technische Daten, Anlagen und mehr. Wetterchen.de - Portal für Wetter und Klima.Web page · wetterchen.de · Published 12 Jan 2025 · medium confidenceSupports: project exists, locationVerified from page text
  • Bebauungsplan Nr. 22Municipal planning document · amt-bokhorst-wankendorf.de · Published 3 Mar 2022 · low confidenceSupports: locationVerified from PDF text · page 11“BEGRÜNDUNG ZUM BEBAUUNGSPLAN NR. 22 DER GEMEINDE SCHILLSDORF Seite - 11 deren Anzahl begrenzt. So sind maximal zwei Wohnungen pro Wohngebäude zulässig. Um einer unerwünschten Verdichtung entgegen zu wirken, ist darüber hinaus eine Mindestgröße der Baugrundstücke festgesetzt. Diese beträgt 800 m² und korrespondiert mit den langen schmalen …”Older source: weighed lower unless it clearly describes the same ongoing project.
  • Windrad soll von Schillsdorf nach Tasdorf rückenNews / press report · shz.de · Published 22 Oct 2020 · low confidenceSupports: locationVerified from page textOlder source: weighed lower unless it clearly describes the same ongoing project.
  • Schillsdorf: Windenergie Zubau (Onshore) in 2025News / press report · windbranche.de · Publication date unknown · low confidenceSupports: locationVerified from page text

No public procurement evidence was found in this verification run.

1 independent external source.

Registry lead relevance: 61 → After external verification: 63 (+2) +2: identity or project only partially corroborated.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.
Developer servicesGrid & electricalEngineeringCivil / BOPMarket intelligence

Investigation hypotheses only. They are not evidence that any of these needs currently exist.

Planned units first observed
6
Total registered capacity
42 MW
Capacity per unit
7 MW each
First observed in MaStR snapshot
25 Sept 2026
Planned commissioning
31 Dec 2028

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Asset type (MaStR)
Horizontalläufer
Energy carrier (MaStR)
Wind
Operating status (MaStR)
In Planung

MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: partially corroborated; 1 independent external source at medium confidence or better. External evidence is additional context and never replaces or downgrades the MaStR record; project corroboration is not evidence of procurement or buyer intent.

Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.

First tracked snapshot → 25 Sept 2026

← Back to the brief · 2026-10-24