61Lead relevance · High
Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Lead relevance61
- Project scale (MW)15
- Event type20
- Lifecycle stage10
- Recency1
- Operator identified10
- Multi-unit evidence5
Signal materiality39
- Event type20
- MW affected11
- Units affected8
New planned wind development signal — 3 units / 20.4 MW
Nordwestuckermark, Brandenburg · Operator: REW Regenerative Energien Wichmannsdorf GmbH
3 planned units · 20.4 MW · First observed 25 Sept 2026
- MaStR evidence: HIGH
- Search or evidence retrieval incomplete
What changed
3 new planned wind units totalling 20.4 MW were first observed in this MaStR snapshot.
Why this ranks high. Mid-sized 20.4 MW signal, 3 registrations moving together and the registered operator is known.
What we found
External verification: Search or evidence retrieval incomplete
External search or evidence retrieval could not be completed. This opportunity needs another verification attempt.
- Project company
- REW Regenerative Energien Wichmannsdorf GmbH (registered in MaStR; not confirmed externally)
- Developer
- Not identified
- Project evidence
- None
- Commercial evidence
- None found
- Genehmigung zum Vorhaben Errichtung und Betrieb von ...
- mit Postzustellurkunde UKA Umweltgerechte Kraftanlagen ...“… zur wesentlichen Änderung von acht Windkraftanlagen (WKA) am Standort in 17291 Nordwestuckermark. Sehr geehrte Damen und Herren, auf den zuvor genannten Antrag ergeht nach der Durchführung des immissionsschutzrechtlichen Genehmigungsverfahrens folgende I. Entscheidung 1. Der Firma UKA Umweltgerechte Kraftanlagen GmbH & Co. KG, Dr. Eberle …”
- Geplante Windkraftanlagen in Nordwestuckermark: Nefino
No public procurement evidence was found in this verification run.
No independent external sources.
Registry lead relevance: 61 (unchanged by external verification)
Why it may matter
Possible relevance
Investigation hypotheses only. They are not evidence that any of these needs currently exist.
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
Verify next
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
Change summary
- Planned units first observed
- 3
- Total registered capacity
- 20.4 MW
- Capacity per unit
- 6.8 MW each
- First observed in MaStR snapshot
- 25 Sept 2026
- Planned commissioning
- 01 Jul 2028
Underlying registrations
GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.
Underlying registrations (3)
SEE913673021480View official MaStR record ↗SEE959917598288View official MaStR record ↗SEE979231402917View official MaStR record ↗
Grouping basis
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
MaStR technical details
- Asset type (MaStR)
- Horizontalläufer
- Energy carrier (MaStR)
- Wind
- Operating status (MaStR)
- In Planung
Evidence confidence
MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: search or evidence retrieval incomplete; Search or evidence retrieval incomplete
Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.
Snapshot transition
First tracked snapshot → 25 Sept 2026