New planned asset
61Lead relevance · High

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance61

  • Project scale (MW)15
  • Event type20
  • Lifecycle stage10
  • Recency1
  • Operator identified10
  • Multi-unit evidence5

Signal materiality39

  • Event type20
  • MW affected11
  • Units affected8

New planned wind development signal — 3 units / 20.4 MW

Nordwestuckermark, Brandenburg · Operator: REW Regenerative Energien Wichmannsdorf GmbH

3 planned units · 20.4 MW · First observed 25 Sept 2026

Asset typeHorizontalläufer
Energy carrierWind
Registered operatorREW Regenerative Energien Wichmannsdorf GmbH

3 new planned wind units totalling 20.4 MW were first observed in this MaStR snapshot.

Why this ranks high. Mid-sized 20.4 MW signal, 3 registrations moving together and the registered operator is known.

External verification: Search or evidence retrieval incomplete

External search or evidence retrieval could not be completed. This opportunity needs another verification attempt.

Project company
REW Regenerative Energien Wichmannsdorf GmbH (registered in MaStR; not confirmed externally)
Developer
Not identified
Project evidence
None
Commercial evidence
None found
  • Genehmigung zum Vorhaben Errichtung und Betrieb von ...Permit document · lfu.brandenburg.de · Publication date unknown · low confidenceSupports: company identityJudged from search excerpt only
  • mit Postzustellurkunde UKA Umweltgerechte Kraftanlagen ...Permit document · lfu.brandenburg.de · Published 27 Apr 2026 · low confidenceSupports: locationVerified from PDF text · page 1“… zur wesentlichen Änderung von acht Windkraftanlagen (WKA) am Standort in 17291 Nordwestuckermark. Sehr geehrte Damen und Herren, auf den zuvor genannten Antrag ergeht nach der Durchführung des immissionsschutzrechtlichen Genehmigungsverfahrens folgende I. Entscheidung 1. Der Firma UKA Umweltgerechte Kraftanlagen GmbH & Co. KG, Dr. Eberle …”
  • Geplante Windkraftanlagen in Nordwestuckermark: NefinoWeb page · nefino.de · Publication date unknown · low confidenceSupports: locationVerified from page text

No public procurement evidence was found in this verification run.

No independent external sources.

Registry lead relevance: 61 (unchanged by external verification) External search or evidence retrieval was incomplete; registry score unchanged.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.
Developer servicesGrid & electricalEngineeringCivil / BOPMarket intelligence

Investigation hypotheses only. They are not evidence that any of these needs currently exist.

Planned units first observed
3
Total registered capacity
20.4 MW
Capacity per unit
6.8 MW each
First observed in MaStR snapshot
25 Sept 2026
Planned commissioning
01 Jul 2028

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Asset type (MaStR)
Horizontalläufer
Energy carrier (MaStR)
Wind
Operating status (MaStR)
In Planung

MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: search or evidence retrieval incomplete; Search or evidence retrieval incomplete

Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.

First tracked snapshot → 25 Sept 2026

← Back to the brief · 2026-10-24