Capacity change
62Lead relevance · High

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance62

  • Project scale (MW)14
  • Event type14
  • Lifecycle stage10
  • Recency6
  • Operator identified10
  • Multi-unit evidence5
  • Size of change3

Signal materiality48

  • Event type18
  • Size of change12
  • MW affected10
  • Units affected8

Registered wind capacity reduced (-3.44 MW) — 3 units / 17.56 MW

Rheda-Wiedenbrück, Nordrhein-Westfalen · Operator: Rheda-Wiedenbrücker Energiegenossenschaft eG

3 units · 17.56 MW

Asset typeHorizontalläufer
Energy carrierWind
Registered operatorRheda-Wiedenbrücker Energiegenossenschaft eG

3 wind units registered a capacity change; combined registered capacity moved from 21 MW to 17.56 MW (-3.44 MW).

Why this ranks high. Mid-sized 17.56 MW signal, 3 registrations moving together and the registered operator is known.

A smaller registered capacity may indicate a scaled-back or redesigned project, which could change the scope of engineering and equipment requirements.
Developer servicesGrid & electricalEngineering

Investigation hypotheses only. They are not evidence that any of these needs currently exist.

Units with a capacity change
3
Per-unit change
-1.44 MW to -1 MW
Combined registered capacity now
17.56 MW
Combined change
-3.44 MW (-16%) — from 21 MW

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisLikely site group
Supporting registry evidence: Shared unit-name pattern (“rheda wiedenbrück…”); Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Asset type (MaStR)
Horizontalläufer
Energy carrier (MaStR)
Wind
Operating status (MaStR)
In Planung

MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: not checked; no sources outside MaStR have been consulted.

Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.

14 Sept 2026 → 16 Sept 2026

← Back to the brief · 2026-09-20