Multiple changes
70Lead relevance · High

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance70

  • Project scale (MW)14
  • Event type13
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence5
  • Several changes together5
  • Size of change5

Signal materiality61

  • Event type16
  • Size of change20
  • MW affected11
  • Units affected8
  • Several changes together6

Multiple registry changes (schedule + operator) — 3 units / 18 MW

Lünne, Niedersachsen · Operator: Bürgerenergiegesellschaft Heitel-Ost GmbH & Co. KG

3 units · 18 MW

Asset typeHorizontalläufer
Energy carrierWind
Registered operatorBürgerenergiegesellschaft Heitel-Ost GmbH & Co. KG

3 wind units registered a later planned commissioning date (+244 days). The registered operator changed on 3 wind units.

Why this ranks high. Mid-sized 18 MW signal, 3 registrations moving together, schedule and operator changes recorded together on the same units, unusually large schedule shift (244 days) and the registered operator is known. It may still reflect a registry correction rather than a new commercial need.

Several registry changes were recorded together on the same units. That may indicate a substantive update to the project rather than a routine correction, and is worth investigating.
Developer servicesEngineeringAsset transactionsFinancingMarket intelligence

Investigation hypotheses only. They are not evidence that any of these needs currently exist.

Units with a new planned date
3
Planned commissioning (same for every unit)
Dec 2026 → Aug 2027 (+244 days)
Units with an operator change
3
Previous registered operator
Raiffeisen Lünne Projektentwicklung GmbH
New registered operator
Bürgerenergiegesellschaft Heitel-Ost GmbH & Co. KG

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

  • SEE926633307043WEA05 · 6 MW · 2027-08-31 · Dec 2026 → Aug 2027 (+244 days); operator → Bürgerenergiegesellschaft Heitel-Ost GmbH & Co. KGView official MaStR record ↗
  • SEE991124828581WEA06 · 6 MW · 2027-08-31 · Dec 2026 → Aug 2027 (+244 days); operator → Bürgerenergiegesellschaft Heitel-Ost GmbH & Co. KGView official MaStR record ↗
  • SEE908465709035WEA04 · 6 MW · 2027-08-31 · Dec 2026 → Aug 2027 (+244 days); operator → Bürgerenergiegesellschaft Heitel-Ost GmbH & Co. KGView official MaStR record ↗
Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Asset type (MaStR)
Horizontalläufer
Energy carrier (MaStR)
Wind
Operating status (MaStR)
In Planung

MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: not checked; no sources outside MaStR have been consulted.

Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.

15 Oct 2026 → 17 Oct 2026