Schedule change
60Lead relevance · High

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance60

  • Project scale (MW)13
  • Event type12
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence3
  • Size of change4

Signal materiality47

  • Event type16
  • Size of change17
  • MW affected9
  • Units affected5

Commissioning moved forward by up to 158 days — 2 units / 14 MW

Kutenholz, Niedersachsen · Operator: wpd Windpark Mulsum GmbH & Co. KG

2 units · 14 MW

Asset typeHorizontalläufer
Energy carrierWind
Registered operatorwpd Windpark Mulsum GmbH & Co. KG

2 wind units registered an earlier planned commissioning date (-158 days to -151 days).

Why this ranks high. Mid-sized 14 MW signal and the registered operator is known.

An earlier registered commissioning date may indicate a compressed delivery window and could bring supplier or service requirements forward. It may also be a registry correction.
Developer servicesEngineeringMarket intelligence

Investigation hypotheses only. They are not evidence that any of these needs currently exist.

Units with a new planned date
2
Planned commissioning before
01 Sept 2028
Planned commissioning now
27 Mar – 03 Apr 2028
Shift per unit
-158 to -151 days

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Planned/commissioning dates within 7 days of each other
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Asset type (MaStR)
Horizontalläufer
Energy carrier (MaStR)
Wind
Operating status (MaStR)
In Planung

MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: not checked; no sources outside MaStR have been consulted.

Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.

15 Oct 2026 → 17 Oct 2026