Multiple changes
77Lead relevance · Very high

Lead relevance estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Lead relevance77

  • Project scale (MW)18
  • Event type14
  • Lifecycle stage10
  • Recency8
  • Operator identified10
  • Multi-unit evidence6
  • Several changes together5
  • Size of change6

Signal materiality72

  • Event type18
  • Size of change24
  • MW affected13
  • Units affected11
  • Several changes together6

Multiple registry changes (capacity + schedule) — 5 units / 34.5 MW

Emsbüren, Niedersachsen · Operator: Raiffeisen Lünne Projektentwicklung GmbH

5 units · 34.5 MW

Asset typeHorizontalläufer
Energy carrierWind
Registered operatorRaiffeisen Lünne Projektentwicklung GmbH

5 wind units registered a capacity change; combined registered capacity moved from 30 MW to 34.5 MW (+4.5 MW). 5 wind units registered a later planned commissioning date (+548 days).

Why this ranks high. Mid-sized 34.5 MW signal, 5 registrations moving together, capacity and schedule changes recorded together on the same units and the registered operator is known.

Several registry changes were recorded together on the same units. That may indicate a substantive update to the project rather than a routine correction, and is worth investigating.
Developer servicesGrid & electricalEngineeringMarket intelligence

Investigation hypotheses only. They are not evidence that any of these needs currently exist.

Per-unit change
5 units changed from 6 MW to 6.9 MW each
Combined registered capacity now
34.5 MW
Combined change
+4.5 MW (+15%)
Units with a new planned date
5
Planned commissioning (same for every unit)
Dec 2026 → Jun 2028 (+548 days)

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Identical registered change on every unit; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Asset type (MaStR)
Horizontalläufer
Energy carrier (MaStR)
Wind
Operating status (MaStR)
In Planung

MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: not checked; no sources outside MaStR have been consulted.

Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.

15 Oct 2026 → 17 Oct 2026